首页 > 题库 > 350-601
« 返回题库列表

为 CCNP 350-601 考试做准备,获取相关试题和学习资料。Cisco 数据中心 350-601 DCCOR | 思博网络 课程的相关内容。

通过我们的全面学习资料和练习测试,为您的CCNP 350-601考试做好充分准备。 这项为期120分钟的考试属于CCNP和CCIE数据中心认证的一部分。该考试旨在评估考生对数据中心核心技术的理解程度,这些技术包括网络、计算、存储网络、自动化以及安全性等方面。 我们的考试模拟题、样题以及模拟考试都是为了模拟真实的考试环境而设计的,能够为用户提供宝贵的练习机会。 请使用我们的考试资料来提升您的备考效果,从而更有信心应对各种历年真题。 通过我们的考试模拟器和在线试题,你将能够轻松应对Cisco Data Center 350-601 DCCOR考试,从而成功获得该认证。
问题 #1
When an engineer inserts 8-Gb FC SFP port 15 on a Cisco UCS Fabric Interconnect, the port fails. What is a possible cause of the issue?
A. Port 15 is configured as an Ethernet port.
B. Port 15 is configured for 4-Gb FC.
C. Port 15 is missing a license.
D. The polarity of the fiber cable is reversed.
正确答案:C
问题 #2
HSRP adjacency fails to form between Nexus7K-1 and Nexus7K-2. Which action should be taken to solve the problem?
A. Configure preempt on one of the switches in the HSRP group.
B. Configure the same HSRP priority between the two switches.
C. Configure the correct subnet mask on Nexus7K-1.
D. Configure HSRP version 2 on Nexus7K-2.
正确答案:D
问题 #3
A switch is being downgraded to an earlier release because of a problem with the current release. After the switch is downgraded, it can no longer forward traffic. Which action resolves the issue?
A. Enable ISSD after the downgrade is complete.
B. Roll back to the original image.
C. Reload the switch.
D. Shut and no shut the interfaces to the FEX.
正确答案: S
问题 #4
A server fails to boot from the operating system after a RAID1 cluster migration. The RAID remains in an inactive state during and after a service profile association. Which action resolves the issue?
A. Configure the SAN boot target in the service profile.
B. Configure the SAN boot target to any configuration mode.
C. Use a predefined local disk configuration policy.
D. Remove the local disk configuration policy.
正确答案:C
问题 #5
An engineer is configuring boot from iSCSI on a Cisco UCS B-Series Blade Server, but the LUN fails to mount. Which action resolves the issue?
A. Statically configure the target information in the Boot Policy.
B. Configure an MTU size of 9000 on the appliance port.
C. Configure a QoS policy on the vNIC.
D. Set a connection timeout value of 250 in the iSCSI Adapter Policy.
正确答案:B
问题 #6
An engineer removes a VMM domain from an endpoint group called EPG-1, but the distributed port group fails to be deleted. Which action must be taken to resolve the issue?
A. Remove the port group manually.
B. Migrate all virtual machines in the EPG-1 to different hypervisors.
C. Remove the remaining EPGs from the VMM domain.
D. Migrate all virtual machines in the EPG-1 to different port groups.
正确答案:C
问题 #7
A user reports that they cannot reach from a UCS server to an FC Storage array. Which command is used to test communication between an FCF and a target?
A. fcroute
B. traceroute
C. fcping
D. ping
正确答案: S
问题 #8
A web browser displays a “not secure” warning message when accessing the web interface of Cisco UCS Manager. Which action resolves the issue?
A. Load third-party certificate to UCS Manager.
B. Use the correct TCP port for HTTPS.
C. Use a supported web browser.
D. Use a supported version of UCS Manager.
正确答案:A
问题 #9
An attempt to bind the Ethernet interface to vFC fails. Which action resolves the issue?
A. Add the FCoE VLAN to the allowed VLAN list.
B. Configure the FCoE VLAN that corresponds to the vFC VSAN as a private VLAN.
C. Configure the interface as a trunk port.
D. Configure the interface to use the native VLAN of the trunk port.
正确答案:C
问题 #10
A new Cisco Nexus 5548 Switch connects to a network. SAN switching is configured on the switch. The switch fc2/10 NP uplink is shown in the exhibit. Which action ensures that fc2/10 is in an up state?
A. Replace the SFP port module in fc2/10.
B. Configure the admin port type E on the upstream switch that connects the port.
C. Enable NPIV on the upstream switch that connects the port.
D. Configure the BB_credit buffers on the upstream switch that connects the port.
正确答案:DE
问题 #11
Interface fc1/5 is offline. Which action should be taken to troubleshoot the issue?
A. Activate the correct zoneset for VSAN 100.
B. Update the FLOGI database to contain the FLOGI entries for interface fc1/5 in VSAN 100.
C. Update the FCNs database to contain names for VSAN 100.
D. Configure the upstream ports and the server ports to be in VSAN 100.
正确答案:A
问题 #12
An attempt to use a global vNIC redundancy template pair results in a service profile that fails to apply. Which action resolves the issues?
A. Create the peer names before creating the templates.
B. Assign the secondary template first, and then set the peer name.
C. Assign both templates simultaneously.
D. Assign the primary template first, and then set the peer name.
正确答案:A
问题 #13
An engineer discovers that an NPV/NPIV uplink experiences a heavy load and plans to add more uplinks. Which statement about what occurs when the new uplinks are added is true?
A. Only new connections use the new uplinks automatically.
B. Paths must be defined before new connections can use the new uplinks.
C. All connections must be reset before the new uplinks can be used.
D. New and existing connections use the new uplinks automatically.
正确答案:C
问题 #14
An engineer is troubleshooting why user1, user2, and user3 from group STORAGE-ADMINISTRATOR in Microsoft Active Directory cannot log in to the Cisco MDS SSH CLI. Which action resolves the issue?
A. Configure the role name to match the group name on Microsoft Active Directory.
B. Include specific users into MDS role configuration.
C. Configure SSH logins on Cisco MDS switch.
D. Integrate Cisco MDS with Microsoft Active Directory.
正确答案:B
问题 #15
An engineer is troubleshooting a failed DCBX exchange between a server and a Cisco Nexus switch. Which action allows DCBX to successfully negotiate?
A. Enable ETS
B. Enable PFC.
C. Enable Cisco Discovery Protocol.
D. Enable LLDP.
正确答案:C
问题 #16
An engineer is performing a health check on ACI. Which statement about interface Ethernet 1/11 is true?
A. The interface is working correctly and fully operational, but it is not in use.
B. The interface policy is misconfigured.
C. “out-of-service” is the default interface status in ACI.
D. “out-of-service” indicates that no service graph is in use for this interface.
正确答案:A
问题 #17
You have an ACI environment with three APICs, two spine switches, and four-leaf switches. You wipe and reboot all APICs first then leaf and spine switches one-by-one and successfully go through the Initial Setuo dialogue on the APIC 1 CIMC KVM console. When you log in to the APIC1 WebGUI, you notice that you do not see any directly connected leaf switches being discovered under Fabric > Inventory > Fabric Membership. What is the cause of the issue?
A. The leaf nodes were not erased properly, which caused a fabric parameters mismatch with the APIC1.
B. Rebooting the APICs and the leaf and spine switches after wiping them is not required.
C. You forgot to enter the TEP Pool value during the Initial Setup dialogue on APIC1.
D. The same Fabric Name value should be used before after wiping all devices.
正确答案:AD
问题 #18
An engineer attempts to register Cisco UCS Manager to Cisco UCS Central, but the registration fails. The engineer can ping Cisco UCS Central from UCS Manager. Which two actions must the engineer attempt to resolve the problem? (Choose two.)
A. Synchronize the date and time to NTP for Cisco UCS Central and the Cisco UCS domains.
B. Apply the UCS Central license to UCS Central.
C. Place Cisco UCS Manager on the same subnet as Cisco UCS Central.
D. Allow port 443 between Cisco UCS Manager and Cisco UCS Central.
E. Allow port 9443 between Cisco UCS Manager and Cisco UCS Central.
正确答案:D
问题 #19
A customer configures HSRP between two data centers that are interconnected with OTV. The configuration succeeds, but traffic between two ESXi virtual hosts on the same site is routed suboptimally through the OTV overlay. Which two actions optimize the traffic? (Choose two.)
A. Disable first-hop redundancy.
B. Filter HSRP traffic by using a Layer 3 VACL on the OTV edge devices.
C. Filter HSRP by using a Layer 2 MAC-list on the ESXi vSwitch.
D. Filter HSRP traffic by using a Layer 3 VACL on the ESXi vSwitch.
E. Filter HSRP by using a Layer 2 MAC-list on the OTV edge devices.
正确答案:AB
问题 #20
Cisco Unified Computing System Manager raises a critical error message that indicates that the system has overlapping Ethernet and FCoE VLANs. All of the Ethernet traffic on the overlapping VLANs drops. Which action resolves the issue?
A. Modify the VLAN assignment to vNICs.
B. Change the PIN groups on the vHBAs.
C. Modify the FCoE VLAN.
D. Set the FCoE VLAN as the native VLAN on server uplinks.
正确答案: S
问题 #21
The connection between a Cisco Nexus 5548UP switch and a Cisco MDS switch fails to initialize. What is the cause of the issue?
A. VSAN 1 is suspended.
B. The SFP is unsupported.
C. Trunk mode must be activated.
D. The interface is in an incorrect mode.
正确答案:A

即刻预约

免费试听-咨询课程-获取免费资料